Flawed concrete found on Detroit Metro Airport runway

נשלח לפני
 
The $225-million runway that Detroit Metro Airport added in 2001 was expected to last for 30 years, but cracks and flaws in the concrete that started to show just three years after it opened have posed risks to safety and are forcing a costly reconstruction. Airports in Colorado and Nebraska have experienced similar runway issues with the problem known as alkali/silica reaction, or ASR, which causes concrete to expand and crack when exposed to moisture over time. (www.freep.com) עוד...

Sort type: [Top] [Newest]


preacher1
preacher1 5
Good old EPA
tyketto
Brad Littlejohn 1
What does the EPA have to do with this? Reading the article, alkalai/silica reaction (ASR) is responsible for this, and the contractor who won the bid for constructing the runway at KDTW cut costs by trying to mix in sand and gravel. They are responsible for this; incidentally, they are now defunct.
preacher1
preacher1 1
He did for a fact and a what you are saying is correct but in the story itself,
"The cement manufacturing industry has increasingly been under pressure to reduce their levels of harmful emissions into the atmosphere," according to an e-mail from MDOT spokesman Jeff Cranson. "This prompted them to modify their manufacturing process to incorporate a portion of the highly alkaline cement kiln dust back into their final product." Not the EPA all together but they definitely had their hand in it.

כניסה לאתר

עדיין אין לך חשבון? הירשם כעת (ללא תשלום) כדי ליהנות מתכונות מותאמות-אישית, מהתראות טיסה ועוד!
האם ידעת שמעקב הטיסות של FlightAware נתמך על ידי פרסום?
תוכל לעזור לנו לוודא ש-FlightAware יישאר חינמי בכך שתאשר קבלת מודעות מ-flightaware.com. אנו מתאמצים מאוד להקפיד על כך שהמודעות שלנו יהיו רלוונטיות ולא מטרידות כדי ליצור עבורך חוויית משתמש מעולה. מהיר וקל לכלול את המודעות של FlightAware ברשימה הלבנה ואפשר גם לשקול את האפשרות ליצור חשבונות פרמיום.
סגור